Parker Medical Office Building

6000 Semi Loads

74,000 CY

1500 Tons

Stat #4
%

Description

As part of this project 6000 semi loads or 74,000 cubic yards of dirt was imported to the site.  Additionally, 59 loads or 1500 tons of bedding, rock and class 1 structural fill we brought to the site.  Close coordination with the project manager, owner and the Town of Parker was needed to make this project a success.  The Fiore Logistic team rose to the occasion and delivered for the team.