Life Church

12,000+ CY

90,000 Tons

Stat #4
%

Description

As part of construction of the new Life Church over 12,000 cubic yard of dirt was exported from the site.  Along with 90,000 tons of structural fill, bedding and road base was imported into the site as part of the success of the project.  The size of the project site coupled with the large building required close coordination with the General contractor and other trades on site.  The Fiore logistics team rose to the occasion and delivered in big way.